-
3 Strategies to consider to optimize production
[et_pb_section fb_built=”1″ _builder_version=”3.3″][/et_pb_section] Introduction Realistically, whether we like it or not, the main goal of any business activity is to maximize profit, that is, to make more money. Wether it […]
-
High Precision In Demarcation of Utility Locating Services
In the construction of buildings, it is very common to have planned excavations, necessary for the construction of foundations required in the project. Before excavating, builders must ensure that there is no interference between the selected excavation location and buried services. It is necessary that the Utility Locating Services company have high experience and great…
-
First Aids: What we never want to use but we must know accord to ISO 45001:2018 standard
All human activity represents a risk, that is the generalized premise that we must all raise awareness. On many occasions, human groups or societies focus unequivocally on creating economic and social well-being. But we do not consider the risks inherent in the productive processes.
-
Analysis of risk at work
The implementation of an effective Security Policy is an operational strategic decision for the organization that allows us to identify the risks in our Value Processes, control risks and take the necessary preventive measures.
-
Experiences and lessons learned in Mobile Phone Operator Booth (Part 2)
Locating Service for Installation of a fiber optic cable from a junction box that is located on the post, (entrance to the site), to the operations booth of a station of the mobile operator Sprint (@Sprint), www.frontlinecontractors.com in 1903 Lake Pine Dr. Cary – NC 27502. The trench was approximately 180 feet in length.
-
Experiences and lessons learned in Mobile Phone Operator Booth (Part 1)
Locating Service for Installation of a fiber optic cable from a junction box that is located on the post, (entrance to the site), to the operations booth of a station of the mobile operator Sprint (@Sprint), www.frontlinecontractors.com in 1903 Lake Pine Dr. Cary – NC 27502. The trench was approximately 180 feet in length.