-
Why excavation work safety is so important.
Often times many of our customers call us EMERGENCY due to a broken underground service. After starting an assisted excavation work where apparently there are no buried services, when making the first ditches, pipes of buried services such as water, energy, communications, or worse still gas are broken. Leaving the area or sector without service.…
-
High Precision In Demarcation of Utility Locating Services
In the construction of buildings, it is very common to have planned excavations, necessary for the construction of foundations required in the project. Before excavating, builders must ensure that there is no interference between the selected excavation location and buried services. It is necessary that the Utility Locating Services company have high experience and great…
-
PLACES WHERE PROJECTS RF USA HAS PERFOMED UTILITY LOCATING SERVICES
NORT CAROLINA State: North Carolina Limits: North: with Virginia, on the East: with the Atlantic Ocean, on the South: South Carolina, on the Southwest: with Georgia, on the West: with […]
-
Explosion in Durham – NC
Last Wednesday, April 10, 2019, in the vicinity of 115 N. Duke Street in Durham – NC, at 10:07 am the residents of this quiet town felt the roar of […]
-
Excavating or Trencher Machines in the Radiolocation of Services
EXCAVATING OR TRENCHER MACHINES IN THE RADIOLOCATION OF SERVICES. The work with chain trencher machines, DITCH 410 SX, is surprisingly fast, but at the same time of high risks, due to the high impact, when they damage a buried service. For this reason, the Radio Technician must perform a meticulous job of detecting services in…
-
Experiences and lessons learned in Mobile Phone Operator Booth (Part 2)
Locating Service for Installation of a fiber optic cable from a junction box that is located on the post, (entrance to the site), to the operations booth of a station of the mobile operator Sprint (@Sprint), www.frontlinecontractors.com in 1903 Lake Pine Dr. Cary – NC 27502. The trench was approximately 180 feet in length.
-
Experiences and lessons learned in Mobile Phone Operator Booth (Part 1)
Locating Service for Installation of a fiber optic cable from a junction box that is located on the post, (entrance to the site), to the operations booth of a station of the mobile operator Sprint (@Sprint), www.frontlinecontractors.com in 1903 Lake Pine Dr. Cary – NC 27502. The trench was approximately 180 feet in length.