Often in our daily work, we must perform underground detection of services to public or private projects that require excavation for the installation of new and diverse services. It is very common in public roads to break services installed in the subsoil that interfere in the route of installation of new services. For this reason, project managers resort more frequently to our detection services. They seek to minimize risks, costs and time in projects, which represent the breakdown of existing services in the subsoil.
As well as, project managers use the latest technologies in excavating machines or trencher machines capable of opening ditches at a higher speed, with the required quality, according to the service to be installed.
The work with chain trencher machines, DITCH 410 SX, is surprisingly fast, but at the same time of high risks, due to the high impact, when they damage a buried service. For this reason, the Radio Technician must perform a meticulous job of detecting services in the subsoil, in order to guarantee an excavation without damages.
Such is the case of the service provided to the company DECISIVE COMMUNICATIONS (@DecisiveComm) for the company SPECTRUM in the location of underground services of potable water, services and rainwater of 4000 feet in length in Carpenter Fire Station Rd, North Carolina 27519, date 03/06/2019 https://goo.gl/maps/Tv8Bc1fhwiE2
It has been observed the speed and efficiency of this machine. In less than 1 hour he made an advance of 600 feet of excavation length, with the depth and width of the trench required as well as the speed with which it was achieved.
We congratulate our radio operator, for their great work, minimizing any possible risk in the opening of the trench and the company DECISIVE COMMUNICATIOS (@DecisiveComm), for their efficiency achieved in the project, with the quality, risk, cost and time planned.