Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/utilityl/public_html/wp-content/themes/Divi/includes/builder/functions.php on line 5812
Experiences and lessons learned in Mobile Phone Operator Booth (Part 1) - Projects RF USA

Experiences and lessons learned in Mobile Phone Operator Booth (Part 1)

Locating Service for Installation of a fiber optic cable from a junction box that is located on the post, (entrance to the site), to the operations booth of a station of the mobile operator Sprint (@Sprint), www.frontlinecontractors.com in 1903 Lake Pine Dr. Cary – NC 27502. The trench was approximately 180 feet in length.